Tesla has set October 1, 2026 as the date for the reveal of its next-generation Roadster, the fastest vehicle the company has ever produced. The original prototype debuted in November 2017 with production targeted for 2020, followed by at least eight missed timelines due to manufacturing complexity and supply chain constraints. The promised specifications include a 0-to-60 mph time of 1.9 seconds dropping to under one second with the SpaceX thruster package, a top speed exceeding 250 mph, and a range of up to 620 miles per charge. Production and deliveries are expected to begin in the 2027 to 2028 timeframe, making this event designed to re-anchor consumer and investor belief ahead of the commercial rollout.
Source: Read the original article

