Marathon Digital and Nodal Power have launched a 280 kW Bitcoin mining pilot in Utah powered by landfill methane gas. The off-grid facility reports 92% uptime and power costs of approximately $0.03 per kWh. The project tests whether waste methane, a potent greenhouse gas, can be turned into a low-cost power source for Bitcoin mining. This model could help the industry counter criticism over energy consumption by converting an environmental liability into an energy source. If these economics can be replicated, landfill gas mining could become a strategic niche for miners seeking cheap power and stronger environmental positioning.
Source: Read the original article

